Omron NT-series Programmable Terminal V022-E3-1 Instrukcja Użytkownika Strona 276

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 318
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 275
Note

Appendix C
Installation on a DIN Rail
Hook the top part of the rear of the converter unit ((a) in the figure) onto the top edge of the DIN rail, and push the unit
in direction (b).
Then fit end plates on the right and left sides of the converter unit so that the unit cannot shift sideways.
(a)
(b)
Removal from the DIN Rail
Remove the end plates at right and left, then insert a flat-tipped screwdriver into the rail stopper on the bottom of the
unit and pry the unit away.
Installation in an Operation Panel
Make two screw holes in an operation panel wall at least 2 mm thick and secure the converter to the wall with screws.
100 (3.94)
110 (4.33)
30
(1.18)
21
(0.83)
2-M4
(Unit: mm)
In order to ensure a strong installation, the wall of the operation panel must be at
least 2 mm thick.
Przeglądanie stron 275
1 2 ... 271 272 273 274 275 276 277 278 279 280 281 ... 317 318

Komentarze do niniejszej Instrukcji

Brak uwag